" I have a theory that the truth is never told during the nine-to-five hours." Hunter S. Thompson
Heritage & Savoir-faire
Partager

NM, la Naissance d’une Montre: interview of Michel Boulanger 2/2

Le 21 December 2015
Malik
Malik "Pifpaf" Bahri
L'auteur.

Hello everyone,

The first part here.
In order to narrate to you the first years of the adventure, I interviewed Michel:
Hi Michel Boulanger,

Hi Pifpaf,

PP : how did the adventure start for you?

MB : by the end of June 2010, I got a phone call from a member of GF. I didn’t understant what he wanted. I listened carefully and I said yes. Then I hung up, went on holidays and forgot about it…   

PP : like Gary Kildall who missed the MDSOS sale at IBM in 1980, you nearly missed the deal of the century too, didn’t you!!

MB : yes and no, everything worked out, because Robert is much nicer than IBM, he called me back a month later and gave me the details of the project. I would have found it hard to believe if I hadn’t known what he is able to produce. I came to Switzerland and we discussed it in detail, and it  appealed to me immediately.  I wanted to take a step back from National Education. As a teacher, if you want to do the job well, you have to keep connected with the professional world to remain competent. I felt I had an opportunity here. Robert told me: “try to picture a handmade watch mechanism you’d like to produce conventionally”…  

PP : what did you have in mind?

MB: Several complicated projects, including chronographs, countdowns, grandes sonneries… some stuffs that might not have worked. Besides,  some of them were focussing too much on watchmaking, and not enough on the learning process.
So we decided to go back to the beginning: I make the watch from A to Z (apart from a few elements, such as the rubies, the balance-spring and the barrel spring), with pre-quartz-crisis tools and alloys: watchmaker lathe (including the 70), spiromatic, mechanical calculator, profile projector, jig-boring machine, tap and die, ect… I work with tools from the 50’s, 60’s, 70’s 99% of the time, and most importantly, the constraint is the following: no numerical control machine (the watchmaking farmer). Every action is manual: I push the chariot myself toward the chisel, and if I’m nervous or tired, I spoil my part.

Michel at the watchmaker lathe

Michel Boulanger tour horloger

PP : how did you manage to master all those old tools?

MB : Robert suggested that Philippe joins NM, which strenghtened my desire to move forward on the Garde-temps and I wasn’t disappointed. Philippe transmits openly, in full-hearted partnership. He’s very generous, the antithesis of  “taiseux” (for montain dwellers, the term refers to an individual who remains silent). He’s as communicative as he is difficult to work with, with a high level of demands, which is not unnecessary given the NM constraints.       

PP : can you tell us more about those constraints?

MB : the NM project combines as many constraints as possible: the use of old and little productive tools, diffucult to adjust , together  with the high level of demand required by GF and Philippe Dufour in terms of finishings, reliability, chronometry or level of interchangeability  of the parts.  

It is intrinsically very challenging to produce 11 pieces from A to Z in my own garage, with Robert and Philippe as excellence keepers. It’s a constant challenge to go beyond myself to reach the ultimate objective.

PP : When did you start the production?

MB : wooh, not so fast, we’re in septembre 2011. I got 100% involved in NM, it was the beginning of the adventure and the work sessions were full of people. We wasted a lot of time during the first year, because every one had an opinion (some said I should try to do like this, like that…). The postive side is that all this contributed to the tremendous evolution of the drawings. Compare the first version of the calibre and the one we have today, it’s like night and day. There have been around ten different drawings of the calibre and more than twenty of the tourbillon cage so far, mostly in 2011.

PP : here we are, early 2012…

MB : it was the SIHH: we presented NM to the public for the first time. Most of the people had come to see Philippe.  We hadn’t communicated much on the project, we’d just said that we were making a watch without any CNC intervention. It was well received, but the people didn’t really understand. They were still a bit sceptical, which is natural. It was difficult for them to picture what we had in mind, as we still hadn’t presented any concrete watch.  

PP : then you started the production?

MB : We continued the discussions from 2011. By confronting the theories of 2011 with the reality, we realised that they were obsolete, for lack of a  global vision of the production of a piece from A to Z with no numerical control.  

With Didier Cretin, we conducted historical research at the storeroom of the International Watchmaking Museum (thanks to Mr Piguet) and at the storeroom of the Musée du Château des Monts (thanks to Gerald Vouga). We only met really cool people who gave us complete accessibility. We consulted everything between 1750 and 1850.
Our discussions mainly focused on the production of the pieces, how many and what type of wheels, and the methodology of the traditional fabrication. This was a crucial step to push back limits of my mastery of the 70 lathe.

PP : destination SIHH 2013 ?

MB : we wanted to introduce the finalised tourbillon cage to the public. We made some mistakes in terms of production. Thanks to JF Erard, the drawings evolved considerably. I took two months to produce the first frame. At the same time, we continued to develop the winding/time-setting part of the Garde-Temps.

Once at the SIHH 2013, we had achieved our goal: the frame was there: partial case (bottom, top + the two carriage-bridges)+ balance, all installed on the plate. As it started to look concrete, we could feel a slight quivering, in particular because we communicated on the functions of the Garde-Temps.

The tourbillon cage, SIHH2013

Cage du tourbillon

PP : This is 2013, is the project taking shape now?

MB : we’re clearly at the heart of the action. Our objective was to hear “tic tac” from the movement at the SIHH2014, without targeting the chronometric accuracy. This was a huge challenge. Indeed, I had to produce 90% of the components (mainly the moving parts)and make it all work!

In addition, like every year, we slightly improved the plans… In particular, we removed an arm and a screw on the tourbillon cage, which reduced the weight by 30%.

This year was especially intense, because I thought that the plans were definitive. I produced some micro-series of 5 or 6 pieces.  The numerous videos on the Garde-Temps web site were made at that period.

PP : 2014, after three years of maturation, the first concrete result?

MB : the big issue for the SIHH2014 was to have this working movement… I worked very hard. Eventually, I was ahead of schedule, I could hear “tic tac” the saturday morning before the SIHH!!
And above all I was very proud because the mechanism, in its most basic form, worked during all the SIHH despite a simple glass dome covering it, and it’s still working today!!

The calibre of the Garde-temps, 2014

Le Garde tempsLe mouvement du Garde-temps (2)

PP : were there any changes during the year 2014?

MB : well, indeed, Didier suggested an in-depth re-examination of the plans of the Garde-Temps, which Robert accepted, still with this orientation for excellence… it was complicated for me, I wanted to improve my movement, already produced in micro-series… additional constraint: I had to go back giving classes in september 2014, and lastly, I had to perfect the production of the Breguet-overcoil spring with Philippe.  

Finally, iI made a whole new movement. I saved a few parts, but most of it had to be revised, in particular the plate and the bridges . I remanufactured 60% of the parts that year.

PP : impossible task ?

MB : yes and no, because without the help of Jean-François Erard, I would have waste some time as the latter was becoming a rare commodity. His precious advices provided me a better understanding of the turning and milling, and I could produce and assemble the components.  

The case was another issue. We agreed to use a service provider, who had to respect our qualitative requirements and production constraints: no use of numerical control.

During the whole year, I juggled between many trips back and forth to Switzerland, especially to learn how to raise the balance-spring with Philippe… to give you an idea of the athmosphere: on Christmas day,  I was having lunch with my sister’s family in Picardie, and I hastily left at 2 pm to go back to my place and start working at 7pm…

Philippe Dufour on the balance-spring

Philippe Dufour Reglage Spiral (2)

PP : that’s crazy !! you even worked on Christmas day to present the assembled Garde-Temps at the SIHH?  

MB: Yes, but it was worth it, because I finalised the whole assembly of the Garde-Temps in extremis. The success was proportional to the stress, I couln’t take any lunch break during the show. I decided to accompany the Garde-temps wherever it was going. I thus attended the conferences, but also the meetings with the collectors and the retailers… And I have to say, it was kind of a strange feeling, when you have spent so many hours producing a watch in your cellar. Icing on the cake, I could bring two of my students with me, which was a beautiful symbol of the transmission spirit behind NM.

This copy of the Garde-Temps is going to be sold at Christie’s, in May in Geneva, as a school-watch, that’s to say without the finishings. This will be a good test of the enthusiasm of collectors for the Garde-Temps.

The Time Aeon foundation, which was at the origin of the project, has become the platform for knowledge-sharing of NM. Several institutions, retailers and watchmaking houses have joined us, and the project gets bigger as the Garde-Temps takes shape. For instance, the FHH offers us a whole little stand during the SIHH. 

Naissance d’une Montre, school watch, functionnal

Le Garde Temps la Naissance d'une Montre (14)Le Garde Temps la Naissance d'une Montre (19)

PP : what did you learn this year?

MB : The decoration, the last step! I approached it a bit differently, because I knew nothing about it. But to keep this experience fun, I wanted to keep a fresh eye.

In order to learn, I decorate and polish on my own, then I show the result to Séverine and Philippe so they can teach me their methods. The advantage is that failure provides an incredible experience: it’s tough, I spoil parts, but my learning isn’t linear, it’s more pertinent, I get a better understanding of the whys, and I recall information better. It also helps me perfecting my machinig skills: a well-machined component is easier to decorate.

  • To me, learning is a quest rather than a reproduction of knowledges.

Michel & Philippe, actors of an institutional film on NM

08 Spiral NM 04 Philippe & Michel tournageMichel Boulanger & Philippe Dufour

PP : which aspects of the decoration have you worked on?

MB : The Garde-temps will be decorated according to the standards of the golden age of mechanical watchmaking, between 1750 and 1850, which therefore excludes the Geneva waves, typical of Switzerland (at that time, watchmaking was mostly based in London and Paris). Thus, I learned the roughening of the bridges, the axis polishing (arbors), drawing, circular graining, bevelling on the wheels, hand-polishing of the bridges flanks. This last part is innovative, because we try to find an expertise that had been lost since then…

PP : is the year 2015 much slower for you?

MB : Yes and no. The decoration part is super exciting, it’s great because the piece really gets magical at that point, it’s the culmination of the first phase.

PP : the first phase, isn’t the project completed yet?

MB : This is just the beginning. First of all, I have to finalise the production of the 11 Garde-temps, which is far from being done… Then, and this is the objective of NM, I have to train a few young watchmakers, so one day  some others will be trained by them.  

In a few years, I will probably be done with NM but, ultimately, the project is designed to outlive us all, so that the great watchmaking tradition will never again be forgotten .